Some new problems on two-agent scheduling to minimize the earliness costs
Year of publication: |
2014
|
---|---|
Authors: | Cheng, Shuenn-ren |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 156.2014, p. 24-30
|
Subject: | Single-machine | Two-agent | Maximum earliness cost | Total weighted earliness cost | Theorie | Theory | Kosten | Costs | Scheduling-Verfahren | Scheduling problem |
-
Some new problems on two-agent scheduling to minimize the earliness costs
Cheng, Shuenn-Ren, (2014)
-
Two-agent single-machine scheduling with cumulative deterioration
Chen, Ren-Xia, (2019)
-
Competitive two-agent scheduling with release dates and preemption on a single machine
Li, Shi-Sheng, (2023)
- More ...
-
Parallel-Machine Scheduling to Minimize Flowtime, Holding, and Batch Delivery Costs
Yin, Yunqiang, (2014)
-
Genetic Algorithm for a Two-Agent Scheduling Problem with Truncated Learning Consideration
Wu, Wen-Hsiang, (2014)
-
Some new problems on two-agent scheduling to minimize the earliness costs
Cheng, Shuenn-Ren, (2014)
- More ...