//-->
A systematic analysis of the break subsystems of a wheat flour pilot mill.
Yuan, J., (2003)
Single‐machine scheduling with deadlines to minimize the total weighted late work
Chen, Rubing, (2019)
Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
Zhang, Yuan, (2020)