//-->
A branch-and-bound-based local search method for the flow shop problem
Haouari, M., (2003)
Minimizing maximum lateness in a flow shop subject to release dates
Haouari, M., (2007)
Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
Ladhari, T., (2012)