Techniques for inserting additional trains into existing timetables
In this paper techniques for scheduling additional train services (SATS) are considered as is train scheduling involving general time window constraints, fixed operations, maintenance activities and periods of section unavailability. The SATS problem is important because additional services must often be given access to the railway and subsequently integrated into current timetables. The SATS problem therefore considers the competition for railway infrastructure between new services and existing services belonging to the same or different operators. The SATS problem is characterised as a hybrid job shop scheduling problem with time window constraints. To solve this problem constructive algorithm and meta-heuristic scheduling techniques that operate upon a disjunctive graph model of train operations are utilised. From numerical investigations the proposed framework and associated techniques are tested and shown to be effective.
Year of publication: |
2009
|
---|---|
Authors: | Burdett, R.L. ; Kozan, E. |
Published in: |
Transportation Research Part B: Methodological. - Elsevier, ISSN 0191-2615. - Vol. 43.2009, 8-9, p. 821-836
|
Publisher: |
Elsevier |
Keywords: | Train scheduling Job shops Time windows Meta-heuristics |
Saved in:
Saved in favorites
Similar items by person
-
An integrated approach for earthwork allocation, sequencing and routing
Burdett, R.L., (2014)
-
Theoretical Papers - Sequencing and scheduling in flowshops with task redistribution
Burdett, R.L., (2001)
-
A disjunctive graph model and framework for constructing new train schedules
Burdett, R.L., (2010)
- More ...