//-->
Heuristic algorithms for buffer allocation in a production line with unreliable machines
Seong, D., (1995)
Production planning and control in major industries in Korea
Hong, Y., (1998)
Analysis of behaviour of an unreliable n-stage transfer line with (n--1) interstage storage buffers.
Glassey, C.R., (1993)