The distributed flow shop scheduling problem with inter-factory transportation
Year of publication: |
2025
|
---|---|
Authors: | Becker, Tristan ; Neufeld, Janis S. ; Buscher, Udo |
Published in: |
European journal of operational research : EJOR. - Amsterdam [u.a.] : Elsevier, ISSN 0377-2217, ZDB-ID 1501061-2. - Vol. 322.2025, 1 (1.4.), p. 39-55
|
Subject: | Combinatorial optimization | Distributed flow shop | Heuristic algorithms | Inter-factory transportation | Scheduling | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Algorithmus | Algorithm | Theorie | Theory | Durchlaufzeit | Lead time |
-
Dubois-Lacoste, Jérémie, (2017)
-
Soares, Leonardo Cabral R., (2020)
-
Heuristic algorithms for the minmax regret flow-shop problem with interval processing times
Ćwik, Michał, (2018)
- More ...
-
Maschinenbelegungsplanung mit Teilebewegungen zwischen Fertigungsinseln
Neufeld, Janis S., (2014)
-
A comprehensive review of flowshop group scheduling literature
Neufeld, Janis S., (2016)
-
Scheduling dynamic job shop manufacturing cells with family setup times : a simulation study
Klausnitzer, Armin, (2017)
- More ...