The link between lean manufacturing practices and concurrent engineering method of new product development : an empirical study
| Year of publication: |
2013
|
|---|---|
| Authors: | Meybodi, Mohammad Z. |
| Published in: |
Benchmarking : an international journal ; BIJ. - Bingley : Emerald, ISSN 1463-5771, ZDB-ID 1473104-6. - Vol. 20.2013, 3, p. 362-376
|
| Subject: | Product development | New products | Lean production | New product development | Lean manufacturing | Concurrent engineering | Produktentwicklung | Lean Production | Innovation | Innovationsmanagement | Innovation management | Industrie | Manufacturing industries | Lean Management | Lean management |
-
Al-Shboul, Moh'd Anwer, (2025)
-
Basu, Protik, (2022)
-
A road map for implementing lean and agile techniques in SMEs product development teams
Leite, Marco, (2016)
- More ...
-
Integrated benchmarking performance measures
Meybodi, Mohammad Z., (2008)
-
Meybodi, Mohammad Z., (2005)
-
The links between just-in-time practices and alignment of benchmarking performance measures
Meybodi, Mohammad Z., (2015)
- More ...