//-->
Dynamic Production Plan of Probabilistic Market Demand and Fixed Selling Time with Unreliable Machines and Obtainable Working Hour Capacity
Chen, Miao-Sheng, (2001)
The maximal profit flow model in designing multiple-production-line system with obtainable resource capacity
The design of multiple production lines under deadline constraint
Lan, Chun-Hsiung, (2007)