//-->
Locating sensors to observe network arc flows : exact and heuristic approaches
Bianco, L., (2014)
Quay crane scheduling with draft and trim constraints
Wu, Lingxiao, (2017)
A new benchmark optimization problem of adaptable difficulty : theoretical considerations and practical testing
Karpouzos, D. K., (2021)
Network construction problems with due dates
Averbakh, Igor, (2015)
The Robust Set Covering Problem with interval data
Pereira, Jordi, (2013)
The flowtime network construction problem
Averbakh, Igor, (2012)