//-->
A review of lot streaming in a flow shop environment with makespan criteria
Gómez-Gasquet, Pedro, (2013)
Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup
Carvalho, Desiree M., (2022)
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
Clark, Alistair, (2014)
New heuristics for m-machine no-wait flowshop to minimize total completion time
Aldowaisan, Tariq, (2004)
Total completion time with makespan constraint in no-wait flowshops with setup times
Allahverdi, Ali, (2014)
A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times
Allahverdi, Ali, (2006)