Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries
Year of publication: |
2012
|
---|---|
Authors: | Camargo, Victor C. B. ; Toledo, Franklina Maria Bragion de ; Almada-Lobo, Bernardo |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 63.2012, 11, p. 1613-1630
|
Subject: | Produktionssteuerung | Production control | Losgröße | Lot size | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Mathematische Optimierung | Mathematical programming |
-
Optimising lot sizing with nonlinear production rates in a multi-product single-machine environment
Neidigh, Robert O., (2013)
-
Trigos, Federico, (2016)
-
Optimising lot sizing with nonlinear production rates in a multi-product multi-machine environment
Neidigh, Robert O., (2017)
- More ...
-
HOPS – Hamming-Oriented Partition Search for production planning in the spinning industry
Camargo, Victor C. B., (2014)
-
A knapsack problem as a tool to solve the production planning problem in small foundries
Camargo, Victor C. B., (2012)
-
The production planning problem of orders in small foundries
Furtado, Maria Gabriela S., (2019)
- More ...