Time-based goal chasing method for mixed-model assembly line problem with multiple work stations
Year of publication: |
2002
|
---|---|
Authors: | Kurashige, Kenji ; Yanagawa, Yoshinari ; Miyazaki, Shigeji ; Kameyama, Yoshimasa |
Published in: |
Production planning & control : PPC. - London [u.a.] : Taylor & Francis, ISSN 0953-7287, ZDB-ID 10481977. - Vol. 13.2002, 8, p. 735-745
|
Saved in:
Saved in favorites
Similar items by person
-
Sequencing method for products in consideration of assembly time
Kurashige, Kenji, (1999)
-
Sequencing method for products in consideration of assembly time
Kurashige, Kenji, (1999)
-
Scheduling in an automated flow shop to minimize cost: Backward-meta scheduling method
Kawtummachai, Ruengsak, (1997)
- More ...