Timing control points via simulation for production systems under random disturbances
Year of publication: |
2001
|
---|---|
Authors: | Golenko-Ginzburg, Dimitri ; Laslo, Zohar |
Published in: |
Mathematics and Computers in Simulation (MATCOM). - Elsevier, ISSN 0378-4754. - Vol. 54.2001, 6, p. 451-458
|
Publisher: |
Elsevier |
Subject: | On-line control | Control point | Semi-automated production system | Sequential statistical analysis | Chance constraint |
-
Two-level cost-optimization production control model under random disturbances
Golenko-Ginzburg, Dimitri, (2000)
-
Developing cost-optimization production control model via simulation
Golenko-Ginzburg, Dimitri, (1999)
-
Sensitivity Analysis from Sample Paths Using Likelihoods
Heidelberger, Philip, (1989)
- More ...
-
Resource constrained scheduling simulation model for alternative stochastic network projects
Golenko-Ginzburg, Dimitri, (2003)
-
Laslo, Zohar, (2008)
-
Laslo, Zohar, (2008)
- More ...