Total completion time minimisation of no-wait flowshop group scheduling problem with sequence dependent setup times
Year of publication: |
2017
|
---|---|
Authors: | Behjat, Saeed ; Salmasi, Nasser |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 11.2017, 1, p. 22-48
|
Subject: | no-wait flowshop | group scheduling | minimisation of total completion time | sequence dependent setup time | mathematical programming | metaheuristics | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Evolutionärer Algorithmus | Evolutionary algorithm | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming | Algorithmus | Algorithm |
-
Hosseinzadeh, Mohammad Reza, (2022)
-
Samouei, Parvaneh, (2023)
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
- More ...
-
Varmazyar, Mohsen, (2019)
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
-
Jafari, Hamed, (2015)
- More ...