//-->
A review and classification of heuristics for permutation flow-stop scheduling with makespan objective
Framinan, J.M., (2005)
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
Framinan, J.M., (2004)
Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem
Framinan, J.M., (2003)