Two-agent single-machine scheduling with release dates and preemption to minimize the maximum lateness
Year of publication: |
2015
|
---|---|
Authors: | Yuan, J. J. ; Ng, C. T. ; Cheng, T. C. E. |
Published in: |
Journal of scheduling. - New York, NY : Springer Science + Business Media LLC, ISSN 1094-6136, ZDB-ID 1492486-9. - Vol. 18.2015, 2, p. 147-153
|
Subject: | Two-agent scheduling | Pareto optimization | Single machine | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Branch-and-Bound | Branch and Bound | Produktionssteuerung | Production control |
-
Wang, Shijin, (2013)
-
Minimizing maximum tardiness on a single machine with family setup times and machine disruption
Molaee, Ehsan, (2021)
-
Single machine scheduling to maximize the number of on-time jobs with generalized due-dates
Gerstl, Enrique, (2020)
- More ...
-
A branch-and-bound algorithm for solving a two-machine flow shop problem with deteriorating jobs
Ng, C. T., (2010)
-
Ng, C. T., (2010)
-
Ng, C. T., (2010)
- More ...