Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objecitve tabu search method
Year of publication: |
2014
|
---|---|
Authors: | Wang, Shijin ; Liu, Ming |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 5 (1.3.), p. 1495-1508
|
Subject: | two-stage hybrid flow shop | preventive maintenance | availability | multi-objective optimisation | tabu search | NSGA-II | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Heuristik | Heuristics | Deregulierung | Deregulation | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis |
-
Wang, Shijin, (2013)
-
Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem
Safaei, Nima, (2012)
-
Wu, Cheng-Hung, (2020)
- More ...
-
Scheduling deteriorating jobs with past-sequence-dependent delivery times
Liu, Ming, (2013)
-
Liu, Ming, (2016)
-
A branch-and-bound algorithm for two-stage no-wait hybrid flow-shop scheduling
Wang, Shijin, (2015)
- More ...