Two-stage hybrid flow shop scheduling with preventive maintenance using multi-objecitve tabu search method
Year of publication: |
2014
|
---|---|
Authors: | Wang, Shijin ; Liu, Ming |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 52.2014, 5 (1.3.), p. 1495-1508
|
Subject: | two-stage hybrid flow shop | preventive maintenance | availability | multi-objective optimisation | tabu search | NSGA-II | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Evolutionärer Algorithmus | Evolutionary algorithm | Heuristik | Heuristics | Durchlaufzeit | Lead time | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis |
-
Wang, Shijin, (2013)
-
Samouei, Parvaneh, (2023)
-
An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem
Ham, Yu-yan, (2014)
- More ...
-
An integrated approach for a new flexible multi-product disassembly line balancing problem
Hu, Peng, (2022)
-
Scheduling deteriorating jobs with past-sequence-dependent delivery times
Liu, Ming, (2013)
-
A heuristic method for two-stage hybrid flow shop with dedicated machines
Wang, Shijin, (2013)
- More ...