//-->
Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective
Weng, Michael X., (2001)
Evaluation on industrialization potential of olympic technologies based on D-S theory
Ren, Haiying, (2009)
An agent-based scheduling method for flexible job shops