Worst-case analysis of heuristic algorithms for two-machine open shop scheduling problem with route-dependent processing times
Year of publication: |
[1993]
|
---|---|
Authors: | Strusevich, Vitaly A. ; Waart, A. J. van de ; Dekker, Rommert |
Publisher: |
Rotterdam |
Subject: | Produktionssteuerung | Production control | Theorie | Theory |
-
EWMA p charts under sampling by variables
Knoth, Sven, (2013)
-
Performance analysis of re-entrant manufacturing networks under surplus-based production control
Starkov, K. K., (2013)
-
Hajji, A., (2012)
- More ...
-
Strusevich, Vitaly A., (1993)
-
Two-machine open shop scheduling with an availability constraint
Breit, Joachim, (2000)
-
Non-preemptive two-machine open shop scheduling with non-availability constraints
Breit, Joachim, (2001)
- More ...