Showing 1 - 10 of 26
This research is a further development of our recent papers [2, 3]. A production system produces a given target amount by a given due date and has several possible speeds which are subject to random disturbances. The system's output can be measured only at present inspection (control) points....
Persistent link: https://www.econbiz.de/10010749914
Persistent link: https://www.econbiz.de/10005311966
Purpose The relationship between the various existing smell taxonomies and the smell impacting factors has been established. The ideology is to identify the most critical smell influencing factors in the vicinity of various software development environments. Design/methodology/approach To...
Persistent link: https://www.econbiz.de/10015347138
Persistent link: https://www.econbiz.de/10015202610
Persistent link: https://www.econbiz.de/10005337286
Persistent link: https://www.econbiz.de/10005347204
Persistent link: https://www.econbiz.de/10005287820
Persistent link: https://www.econbiz.de/10005253258
Consider an m-machine production line for processing identical parts served by a mobile robot. The problem is to find the minimum cycle time for 2-cyclic schedules, in which exactly two parts enter and two parts leave the production line during each cycle. This work treats a special case of the...
Persistent link: https://www.econbiz.de/10008865192
Persistent link: https://www.econbiz.de/10011714271