This paper presents a profit-oriented shift scheduling approach for inbound contact centers. The focus is on systems in which multiple agent classes with different qualifications serve multiple customer classes with different needs. We assume that customers are impatient, abandon if they have to...
Persistent link: https://www.econbiz.de/10010264932
This paper presents an optimization-based solution approach for the dynamic multi-level capacitated lot sizing problem (MLCLSP) with positive lead times. The key idea is to solve a series of mixed-integer programs in an iterative fix-and-optimize algorithm. Each of these programs is optimized...
Persistent link: https://www.econbiz.de/10010264943
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10010264947
In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally...
Persistent link: https://www.econbiz.de/10010294420
This paper presents a generic modeling framework to simultaneously decide about production quantities and maintenance operations for a capacitated resource facing a dynamic demand for di erent types of products. As the resource needs to be setup for each speci c type of product, a lot-sizing...
Persistent link: https://www.econbiz.de/10010332632
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10011776698
We consider a novel generalization of the resource-constrained project scheduling problem (RCPSP). Unlike many established approaches for the RCPSP that aim to minimize the makespan of the project for given static capacity constraints, we consider the important real-life aspect that capacity...
Persistent link: https://www.econbiz.de/10012502870
In stochastic lot sizing subject to dynamic and random demand, the minimization of operational costs is not the only conceivable objective. Minimizing the tardiness in customer demand satisfaction is no less important. Furthermore, the decision maker is interested in production plan stability....
Persistent link: https://www.econbiz.de/10014471643
Long-term throughput, as a key performance indicator of a stochastic flow line, is affected by numerous parameters describing the features of the flow line, such as processing time and buffer size. Fast and accurate evaluation methods for a given set of values for those parameters are a...
Persistent link: https://www.econbiz.de/10014471646
We study the problem to simultaneously decide on the structures and the schedules for an entire portfolio of flexible projects. The projects are flexible as alternative technologies and procedures can be used to achieve the respective project task. The choice between different technologies and...
Persistent link: https://www.econbiz.de/10014503850