Showing 1 - 10 of 12
The article is concerned with competitive cost and availability estimates of complex engineering systems at the bidding stage of availability type support services contracts (CfA). Such estimates are important to calculate the best price that will win the contract in a competitive bidding...
Persistent link: https://www.econbiz.de/10014091512
There is a valuable engineering business opportunity to be gained by judging the optimum balance between the time invested in performing Preventive Maintenance (PM) and Corrective Maintenance (CM). This paper considers this at the equipment type level, which is the Ministry of Defence’s...
Persistent link: https://www.econbiz.de/10014031374
An Industrial Product-Service System (iPS2) is a system that integrates products and services based on systems thinking in an industrial context. Compared with services alone, it creates opportunities for better economic and environmental outcomes because of the additional design parameters,...
Persistent link: https://www.econbiz.de/10014031372
Persistent link: https://www.econbiz.de/10010229024
Persistent link: https://www.econbiz.de/10010203007
Persistent link: https://www.econbiz.de/10010426059
Persistent link: https://www.econbiz.de/10011444051
Persistent link: https://www.econbiz.de/10011565868
Persistent link: https://www.econbiz.de/10011724408
Persistent link: https://www.econbiz.de/10012495602