We consider a production planning problem in an N-machine flowshop subject to breakdown and repair of machines and to non-negativity constraints on work-in process. The machine capacities and demand processes are assumed to be finite-state Markov chains. The problem is to choose the rates of...
Persistent link: https://www.econbiz.de/10012835291
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010414317
The paper is concerned with the problem of optimal production planning in deterministic pull flow lines with multiple products. The objective is to specify the production policy that minimizes the total inventory and backlog costs overtime. Assuming constant product demands and non-decreasing...
Persistent link: https://www.econbiz.de/10012772150
This paper presents an asymptotic analysis of hierarchical manufacturing systems with stochastic demand and machines subject to breakdown and repair as the rate of change in machine states approaches infinity. This situation gives rise to a limiting problem in which the stochastic machine...
Persistent link: https://www.econbiz.de/10014047818
This paper summarizes the results of its detailed version, which considers optimal infinite horizon stochastic production planning problems with capacity and demand to be finite state Markov chains. Turnpike set concepts are introduced to characterize the optimal inventory levels. It is shown...
Persistent link: https://www.econbiz.de/10012834925
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835293
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835668
This paper considers an infinite horizon stochastic production planning problem with demand assumed to be a continuous-time Markov chain. The problems with control (production) and state (inventory) constraints are treated. It is shown that a unique optimal feedback solution exists, after first...
Persistent link: https://www.econbiz.de/10012746800
In this paper, we treat an optimal control problem of a stochastic two-machine flowshop with machines subject to random breakdown and repair. While the problem is difficult to solve, it can be approximated by a deterministic problem when the rates of machine failure and repair become large....
Persistent link: https://www.econbiz.de/10014046911
We consider a production-inventory planning problem with time-varying demands, convex production costs and a warehouse capacity constraint. It is solved by use of the Lagrangian form of the maximum principle. The possible existence of strong decision and forecast horizons is demonstrated. When...
Persistent link: https://www.econbiz.de/10014046438