Showing 1 - 10 of 16
Persistent link: https://www.econbiz.de/10011799196
Persistent link: https://www.econbiz.de/10003906256
Persistent link: https://www.econbiz.de/10009267895
Persistent link: https://www.econbiz.de/10005339933
Persistent link: https://www.econbiz.de/10005253836
Persistent link: https://www.econbiz.de/10005188914
This paper considers a 2-stage assembly flowshop scheduling problem where each job is assembled with two types of components and makespan is the objective measure. For the assembly, one type of the components is outsourced subject to job-dependent lead time but the other type is fabricated...
Persistent link: https://www.econbiz.de/10005066832
This paper considers a single-sourcing network design problem for a three-level supply chain consisting of suppliers, distribution centers (DC's) and retailers, where risk-pooling strategy and DC-to-supplier dependent lead times are considered. The objective is to determine the number and...
Persistent link: https://www.econbiz.de/10009202393
Persistent link: https://www.econbiz.de/10006230248