In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10011326945
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10011256746
In a recent paper, Fisher et al. (2001) present a method to mitigate end-effects in lot sizing byincluding a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10010731382
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10005144509
We consider a model for a serial supply chain in which production, inventory, and transportation decisions are integrated, in the presence of production capacities and for different transportation cost functions. The model we study is a generalization of the traditional single-item economic...
Persistent link: https://www.econbiz.de/10010324804
We consider a model for a serial supply chain in which production, inventory, and transportation decisions are integrated, in the presence of production capacities and for different transportation cost functions. The model we study is a generalization of the traditional single-item economic...
Persistent link: https://www.econbiz.de/10014033651
We consider a model for a serial supply chain in which production, inventory, and transportation decisions are integrated, in the presence of production capacities and for different transportation cost functions. The model we study is a generalization of the traditional single-item economic...
Persistent link: https://www.econbiz.de/10011326946
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10014033650
This paper calls for a change in paradigm in lot sizing and scheduling. Traditionally, a discrete time scale is chosen to model lot sizing and scheduling. As an alternative, the so-called block planning concept is proposed which is based on a continuous representation of time. A mixed-integer...
Persistent link: https://www.econbiz.de/10010414317
The classical economic lot-scheduling problem (ELSP) involves the batch sizing and scheduling of multiple products in a single facility under deterministic conditions over an infinite planning horizon. It is assumed that the products are delivered to customers at continuous rates. In today's...
Persistent link: https://www.econbiz.de/10012935748