//-->
A review of methods and algorithms for optimizing construction scheduling
Zhou, J., (2013)
A polyhedral description of kernels
Chen, Qin, (2016)
Computing integral solutions of complementarity problems
Laan, Gerard van der, (2004)
A combinatorial algorithm for the 1-median problem in with the Chebyshev norm
Hatzl, Johannes, (2010)
A complex time based construction heuristic for batch scheduling problems in the chemical industry
Burkard, Rainer E., (2006)