A note on: an optimal batch size for an imperfect production system with quality assurance an rework
Year of publication: |
2009
|
---|---|
Authors: | Buscher, Udo ; Rudert, Steffen ; Schwarz, Christian |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 47.2009, 24 (15.12.), p. 7063-7067
|
Subject: | Theorie | Theory | Qualitätsmanagement | Quality management | Produktionssystem | Manufacturing system | Losgröße | Lot size |
-
Optimal run time for EPQ model with scrap, rework and stochastic breakdowns : a note
Chiu, Yuan-shyi Peter, (2014)
-
Bouslah, Bassem, (2016)
-
The effects of inspection delay and restoration cost on the optimal inspection and production policy
Tsai, W. C., (2018)
- More ...
-
Rudert, Steffen, (2009)
-
Dynamische Losgrößenplanung mit Wiederaufarbeitungs- und Entsorgungsoptionen
Schwarz, Christian, (2009)
-
On the complexity of the economic lot-sizing problem with rework of defectives
Rudert, Steffen, (2022)
- More ...