A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"
In a recently published paper by Chiu et al. [Chiu, S.W., Wang, S.-L., Chiu, Y.-S.P., 2007. Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns. European Journal of Operational Research 180, 664-676], a theorem on conditional convexity of the integrated total cost function was employed in their solution procedure. We reexamine this theorem and present a direct proof to the convexity of the total cost function. This proof can be used in place of Theorem 1 of Chiu et al.'s paper to enhance quality of their optimization process.
Year of publication: |
2010
|
---|---|
Authors: | Chiu, Yuan-Shyi Peter ; Ting, Chia-Kuan |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 201.2010, 2, p. 641-643
|
Publisher: |
Elsevier |
Keywords: | Manufacturing Machine breakdown Defective item Rework Production |
Saved in:
Saved in favorites
Similar items by person
-
Chiu, Yuan-Shyi Peter, (2010)
-
Incorporating multi-delivery policy and quality assurance into economic production lot size problem
Chiu, Yuan-Shyi Peter, (2009)
-
Chiu, Yuan-shyi Peter, (2010)
- More ...