//-->
A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"
Chiu, Yuan-Shyi Peter, (2010)
Incorporating multi-delivery policy and quality assurance into economic production lot size problem
Chiu, Yuan-Shyi Peter, (2009)
A note on "determining the optimal run time for EPQ model with crap, rework, and stochastic breakdowns"
Chiu, Yuan-shyi Peter, (2010)