A note on “Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan”
Year of publication: |
2015
|
---|---|
Authors: | Hadda, Hatem |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 159.2015, C, p. 221-222
|
Publisher: |
Elsevier |
Subject: | Scheduling | Flow shop | Preventive maintenance | Availability constraint | Makespan |
-
Hadda, Hatem, (2015)
-
Approximation results for the two-machine job shop under limited machine availability
Hadda, Hatem, (2017)
-
Nouri, Behdin Vehedi, (2013)
- More ...
-
A note on “A heuristic method for two-stage hybrid flow shop with dedicated machines”
Hadda, Hatem, (2013)
-
On the two-stage assembly flow shop problem
Hadda, Hatem, (2024)
-
An improved algorithm for the two machine flow shop problem with several availability contraints
Hadda, Hatem, (2010)