A sequencing problem to level part usage rates and work loads for a mixed-model assembly line with a bypass subline
Year of publication: |
1999
|
---|---|
Authors: | Tamura, Takayoshi ; Long, Hong ; Ohno, Katsuhisa |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 60-61.1999, 1, p. 557-564
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Tamura, Takayoshi, (1999)
-
Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
Tamura, Takayoshi, (2011)
-
Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line
Tamura, Takayoshi, (2011)
- More ...