A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
Year of publication: |
2005
|
---|---|
Authors: | LIN, B. M. T. ; WU, J. M. |
Published in: |
Asia-Pacific Journal of Operational Research (APJOR). - World Scientific Publishing Co. Pte. Ltd., ISSN 1793-7019. - Vol. 22.2005, 03, p. 391-407
|
Publisher: |
World Scientific Publishing Co. Pte. Ltd. |
Subject: | Flowshop | total completion time | lower bound | branch-and-bound algorithm |
-
Wang, Jian-Jun, (2015)
-
A beam-search-based constructive heuristic for the PFSP to minimise total flowtime
Fernandez-Viagas, Victor, (2017)
-
Maassen, Kathrin, (2020)
- More ...
-
Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs
Lin, B. M. T., (2004)
-
Minimization of maximum lateness under linear deterioration
Hsu, Y. S., (2003)
-
Lin, B. M. T., (1999)
- More ...