//-->
Determining Optimal Flow-Time Schedules for the Multiple-Product Batch-Flow Problem
Schikora, Paul, (2016)
Determining optimal flow-time schedules for the multiple-product batch-flow problem
Schikora, Paul, (2015)
Post-Balstm a Bagged Lstm Forecasting Ensemble Embedded with a Postponement Framework to Target the Semiconductor Shortage in the Automotive Industry : An Electronics Manufacturing Services Case Study
Soto-Ferrari, Milton, (2023)