Post-Balstm a Bagged Lstm Forecasting Ensemble Embedded with a Postponement Framework to Target the Semiconductor Shortage in the Automotive Industry : An Electronics Manufacturing Services Case Study
Year of publication: |
2023
|
---|---|
Authors: | Soto-Ferrari, Milton ; Bhattacharyya, Kuntal ; Schikora, Paul |
Publisher: |
[S.l.] : SSRN |
Subject: | Kfz-Industrie | Automotive industry | Elektronikindustrie | Electronics industry | Halbleiter | Semiconductor | Halbleiterindustrie | Semiconductor industry |
-
Ramani, Vinay, (2022)
-
Managing the world economy : the consequences of corporate alliances
Cowhey, Peter F., (1993)
-
Confronting the Japanese challenge : the revival of manufacturing at Intel
Lécuyer, Christophe, (2019)
- More ...
-
ARTICLES - Focus On The Classroom - Flowcharting with Excel
Heiser, Daniel R., (2001)
-
Determining Optimal Flow-Time Schedules for the Multiple-Product Batch-Flow Problem
Schikora, Paul, (2016)
-
Determining optimal flow-time schedules for the multiple-product batch-flow problem
Schikora, Paul, (2015)
- More ...