Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping
Year of publication: |
2022
|
---|---|
Authors: | Hasani, Ali ; Hosseini, Seyed Mohammad Hassan |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 138.2022, p. 1-17
|
Subject: | Auxiliary resource | Flexible flow shop | Machine eligibility | Scheduling | Unrelated parallel machines | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning | Flexibles Fertigungssystem | Flexible manufacturing system | Produktionssteuerung | Production control | Heuristik | Heuristics | Theorie | Theory | Algorithmus | Algorithm |
-
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
Rohaninejad, Mohammad, (2016)
-
Muñoz-Díaz, María-Luisa, (2024)
-
Makespan estimation in a flexible job-shop scheduling environment using machine learning
Tremblet, David, (2024)
- More ...
-
Sorting radiology departments in a disaster management assessment with G-ARASsort
Moheimani, Arash, (2025)
-
The effect of combining knowledge-based practices and healthcare policies on healthcare quality
Kolagar, Milad, (2019)
-
Gavahi, Shakiba Sadat, (2023)
- More ...