A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time
Year of publication: |
2021
|
---|---|
Authors: | Suryadhini, Pratya Poeri ; Sukoyo, Sukoyo ; Suprayogi, Suprayogi ; Halim, Abdul Hakim |
Published in: |
Journal of industrial engineering and management : JIEM. - Terrassa : Universitat Politècnica de Catalunya (UPC), ISSN 2013-0953, ZDB-ID 2495074-9. - Vol. 14.2021, 3, p. 520-537
|
Subject: | Actual flowtime | batch scheduling | a three-stage flow shop | job processor | batch processor | sampling inspection | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Produktionssteuerung | Production control | Losgröße | Lot size |
-
A batch scheduling model for "m" heterogeneous batch processor
Hidayat, Nita P. A., (2016)
-
Suryadhini, Pratya Poeri, (2021)
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
- More ...
-
Suryadhini, Pratya Poeri, (2021)
-
Kurniawan, Dwi, (2020)
-
Kurniawan, Dwi, (2020)
- More ...