Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum
Year of publication: |
2010
|
---|---|
Authors: | Kim, Seong-in ; Han, Junghee ; Lee, Youngho ; Park, Eunkyung |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 37.2010, 2, p. 302-314
|
Subject: | Scheduling-Verfahren | Scheduling problem | Losgröße | Lot size | Heuristik | Heuristics | Theorie | Theory | Algorithmus | Algorithm | Ganzzahlige Optimierung | Integer programming | Dekompositionsverfahren | Decomposition method |
-
Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shops
Rohaninejad, Mohammad, (2016)
-
Larroche, François, (2022)
-
Ring hierarchical hub network design problem : exact and heuristic solution methods
Eydi, Alireza, (2022)
- More ...
-
A two-level location-allocation problem in designing local access fiber optic networks
Park, Gigyoung, (2014)
-
A splitter location-allocation problem in designing fiber optic access networks
Kim, Young-Jin, (2011)
-
A ring-mesh topology design problem for optical transport networks
Kim, Young-Jin, (2008)
- More ...