Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Year of publication: |
2007
|
---|---|
Authors: | Chiu, Singa Wang ; Wang, Shan-Ling ; Chiu, Yuan-Shyi Peter |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 2430034. - Vol. 180.2007, 2, p. 664-676
|
Saved in:
Saved in favorites
Similar items by person
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
Chiu, Singa Wang, (2007)
-
A hybrid finite production rate system featuring random breakdown and rework
Chiu, Singa Wang, (2020)
-
Chiu, Singa Wang, (2006)
- More ...