Type of publication: | Article |
---|---|
Language: | English |
Notes: | Cantarelli, Chantal, Molin, Eric J. E., van Wee, Bert and Flyvbjerg, Bent (2012) Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, 22. pp. 88-95. |
Other identifiers: | 10.1016/j.tranpol.2012.04.002 [DOI] |
Source: | BASE |
Persistent link: https://www.econbiz.de/10011425574