Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 2
| Year of publication: |
1997
|
|---|---|
| Authors: | Sharadapriyadarshini, B. ; Rajendran, C. |
| Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 35.1997, 1, p. 101-122
|
Saved in:
Saved in favorites
Similar items by person
-
Heuristics for scheduling in a Kanban system with dual blocking mechanisms
Sharadapriyadarshini, B., (1997)
-
Sharadapriyadarshini, B., (1997)
-
Sharadapriyadarshini, B., (1996)
- More ...