Formulations and heuristics for scheduling in a buffer-constrained flowshop and flowline-based manufacturing cell with different buffer-space requirements for jobs: Part 1
Year of publication: |
1996
|
---|---|
Authors: | Sharadapriyadarshini, B. ; Rajendran, C. |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 34.1996, 12, p. 3465-3486
|
Saved in:
Saved in favorites
Similar items by person
-
Heuristics for scheduling in a Kanban system with dual blocking mechanisms
Sharadapriyadarshini, B., (1997)
-
Sharadapriyadarshini, B., (1997)
-
Sharadapriyadarshini, B., (1997)
- More ...