//-->
A multi-KP modeling for the maximum-clique problem
Croce, F.Della, (1994)
Technical Notes - A new decomposition approach for the single machine total tardiness scheduling problem
Croce, F.Della, (1998)
Minimising makespan in the two-machine flow-shop with release times
Tadei, R., (1998)