Green permutation flowshop scheduling problem with sequence-dependent setup times : a case study
Year of publication: |
2019
|
---|---|
Authors: | Ramezanian, Reza ; Vali‑Siar, Mohammad Mahdi ; Jalalian, Mahdi |
Subject: | constructive heuristic | flowshop scheduling | green manufacturing | energy consumption | sequence-dependent setup times | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Energiekonsum | Energy consumption |
-
An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production
Wang, Shijin, (2020)
-
Green scheduling of a two-machine flowshop : trade-off between makespan and energy consumption
Mansouri, S. Afshin, (2015)
-
Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
Mansouri, S. Afshin, (2016)
- More ...
-
Food supply chain network design under uncertainty and pandemic disruption
Shekarabi, Hanieh, (2024)
-
A firefly algorithm for solving competitive location-design problem: A case study
Sadjadi, Seyed Jafar, (2016)
-
Huff-type competitive facility location model with foresight in a discrete space
Ashtiani, Milad Gorji, (2011)
- More ...