Heuristic algorithms for a practical-size dynamic parallel-machine scheduling problem: integrated-circuit wire bonding
Year of publication: |
2012
|
---|---|
Authors: | Yang, Taho ; Shen, Yu-An |
Published in: |
Production planning & control : PPC. - London [u.a.] : Taylor & Francis, ISSN 0953-7287, ZDB-ID 10481977. - Vol. 23.2012, 1 (1.1.), p. 67-79
|
Saved in:
Saved in favorites
Similar items by person
-
Yang, Taho, (2012)
-
Yang, Taho, (2012)
-
Yang, Taho, (2011)
- More ...