Heuristic control of multiple batch processors with incompatible job families and future job arrivals
Year of publication: |
2012
|
---|---|
Authors: | Tajan, John Benedict C. ; Appa Iyer Sivakumar ; Gershwin, Stanley B. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 15 (1.8.), p. 4206-4219
|
Subject: | batch scheduling | cycle time reduction | semiconductor manufacturing | Scheduling-Verfahren | Scheduling problem | Halbleiterindustrie | Semiconductor industry | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Theorie | Theory | Heuristik | Heuristics | Losgröße | Lot size |
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Shahvari, Omid, (2017)
-
Heuristics for the discrete lotsizing and scheduling problems with setup times
Cattrysse, Dirk G., (1991)
- More ...
-
Controlling job arrivals with processing time windows into batch processor buffer
Tajan, John Benedict C., (2011)
-
Controlling job arrivals with processing time windows into Batch Processor Buffer
Tajan, John Benedict C., (2011)
-
Tajan, John Benedict C., (2012)
- More ...