//-->
A multi-period order selection problem in flexible manufacturing systems
Lee, D.-H., (1998)
Scheduling for an arc-welding robot considering heat-caused distortion
Kim, H.-J., (2005)
A two-stage heuristic for disassembly scheduling with assembly product structure
Lee, D.-H., (2004)