Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times
Year of publication: |
1-15 November 2016
|
---|---|
Authors: | Strohhecker, Jürgen ; Hamann, Michael ; Thun, Jörn-Henrik |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 54.2016, 21/22 (1/15.11.), p. 6747-6767
|
Subject: | scheduling | parallel machines | discrete event simulation | unrelated parallel machine scheduling | sequence-dependent set-up times | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Heuristik | Heuristics | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Algorithmus | Algorithm | Simulation |
-
Ozturk, Onur, (2017)
-
Lopez-Esteve, Axel, (2023)
-
Shen, Liji, (2014)
- More ...
-
Die Produktgestaltung : Rahmenbedingungen, Möglichkeiten, Optimierung
Hamann, Michael, (1975)
-
Die Produktgestaltung : Rahmenbedingungen - Möglichkeiten - Optimierung
Hamann, Michael, (1975)
-
Hamann, Michael, (2009)
- More ...