Makespan minimisation with sequence-dependent machine deterioration and maintenance events
| Year of publication: |
1-15 January 2017
|
|---|---|
| Authors: | Ruiz-Torres, Alex J. ; Paletta, Giuseppe ; M'Hallah, Rym |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 1/2 (1/15.1.), p. 462-479
|
| Subject: | scheduling | maintenance scheduling | sequence-dependent systems | parallel machines | makespan | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Algorithmus | Algorithm | Heuristik | Heuristics | Theorie | Theory |
-
Scheduling jobs and maintenance activities subject to job-dependent machine deteriorations
Grigoriu, Liliana, (2017)
-
Scheduling two parallel machines with machine-dependent availabilities
He, Jie, (2016)
-
Parallel-machine scheduling with machine-dependent maintenance periodic recycles
Li, Guo, (2017)
- More ...
-
M'Hallah, Rym, (2014)
-
Just-in-time two-dimensional bin packing
Polyakovskiy, Sergey, (2021)
-
Juman, Z. A. M. S., (2023)
- More ...