Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem
Year of publication: |
2022
|
---|---|
Authors: | Nasrollahi, Vahid ; Moslehi, Ghasem ; Reisi-Nafchi, Mohammad |
Subject: | Flow shop | Maximum earliness | Maximum tardiness | Number of tardy jobs | Two-agent scheduling | Scheduling-Verfahren | Scheduling problem | Branch-and-Bound | Branch and Bound | Heuristik | Heuristics | Fließfertigung | Assembly-line production | Algorithmus | Algorithm | Produktionsplanung | Production planning | Durchlaufzeit | Lead time |
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
Talens, Carla, (2024)
- More ...
-
Reisi-Nafchi, Mohammad, (2015)
-
Geramipour, Somaye, (2017)
-
Two-agent order acceptance and scheduling to maximise total revenue
Reisi-Nafchi, Mohammad, (2015)
- More ...